Overview
Work History
Timeline
Generic
Samseer Husain

Samseer Husain

Lucknow,UP

Overview

9
9
years of professional experience

Work History

Survey Manager

Archirodon Construction
05.2012 - 05.2013

Project Discretion The Shuaibah-III Independent Water and Power Project (IWPP) is the first IWPP projects in Saudi Arabia and the largest greenfield IWPP in the world.

  • Cultivated a strong reputation as subject matter expert in land surveying practices through ongoing education and training, contributing to the overall credibility of the company.
  • Managed multiple survey projects simultaneously, ensuring timely delivery and client satisfaction.
  • Oversaw budget management for individual projects, monitoring expenses closely to prevent cost overruns or inefficiencies.
  • Implemented safety protocols for fieldwork, reducing the occurrence of accidents or injuries among team members.
  • Collaborated with cross-functional teams to achieve comprehensive survey results.
  • Trained junior surveyors and developed their skills in various survey methodologies.
  • Analyzed complex data sets, providing clients with actionable insights for informed decision making.
  • Mentored junior staff members in professional development opportunities, fostering a culture of growth within the organization.
  • Developed strong relationships with clients, leading to increased repeat business and positive referrals.
  • Communicated effectively with stakeholders at all levels of an organization to ensure clear understanding of project goals and expectations.
  • Coordinated surveys to establish accurate legal boundaries for properties.
  • Reviewed and checked survey, subdivision and parcel maps to verify compliance with laws.
  • Trained and directed assistants to complete professional surveys of different types of properties.

Survey Manager

Archirodon Construction
04.2011 - 04.2012

Service : Electrical Power

Discipline : Electrical Power

Client : SCECO Western Region

Project Description :

Scope of work

Power Plant having 5x350 MW capacity Steam Turbines with all auxiliaries, sea water intake and outfall, Fuel Receiving Jettty with 1.0 MGPD MSF water desalination plant.

380kV transmission lines from Shoaiba to Jeddah and Makkah.

380/110kV GIS Substations at Shoaiba.

Extension of existing 380kV Substations at Jeddah and Makkah.

(SAR) 3,500,000,000COST

  • Conducted quality control checks on fieldwork to maintain high standards of accuracy and precision.
  • Prepared detailed reports summarizing project progress, challenges encountered, and recommendations for future improvements.
  • Collaborated with cross-functional teams to achieve comprehensive survey results.
  • Implemented safety protocols for fieldwork, reducing the occurrence of accidents or injuries among team members.
  • Oversaw budget management for individual projects, monitoring expenses closely to prevent cost overruns or inefficiencies.
  • Managed multiple survey projects simultaneously, ensuring timely delivery and client satisfaction.
  • Cultivated a strong reputation as subject matter expert in land surveying practices through ongoing education and training, contributing to the overall credibility of the company.
  • Trained junior surveyors and developed their skills in various survey methodologies.
  • Analyzed complex data sets, providing clients with actionable insights for informed decision making.
  • Mentored junior staff members in professional development opportunities, fostering a culture of growth within the organization.
  • Developed strong relationships with clients, leading to increased repeat business and positive referrals.
  • Coordinated logistics for site visits, ensuring efficient use of resources and minimal scheduling conflicts.
  • Coordinated surveys to establish accurate legal boundaries for properties.
  • Reviewed and checked survey, subdivision and parcel maps to verify compliance with laws.
  • Trained and directed assistants to complete professional surveys of different types of properties.

Project Chief Hydrographic Surveyor

Archirodon Construction
03.2010 - 04.2011

Project Discretion : Dredging reclamation and Qua wall and breakwater

  • Conducted Hydrographic and topographic surveys to support Dredging and reclamation land development projects, resulting in successful completion within deadlines.
  • Conducting multi beam and single beam installation and calibration and data collation and data processing
  • Implemented new surveying technology to increase data collection efficiency, significantly reducing project turnaround times.
  • Conducted precise measurements for construction projects to ensure structures were built within designated boundaries.
  • Conducted risk assessments for potential construction sites, identifying and mitigating factors that could impact project viability.
  • Collaborated with architects and engineers to refine project plans, ensuring all structures were designed with accurate land topography in mind.
  • Led training sessions for junior surveyors, enhancing team skills and improving overall project performance.
  • Established control networks to maintain consistency throughout large-scale construction projects.
  • Improved client satisfaction by providing clear and concise reports on property boundaries and potential issues.

Project Chief Hydrographic &Topographic Surveyor

HUTA Group
03.2008 - 04.2010

Project Location King Fahad Industrial Port (Jubail) Saudi Arab

Project Discabtion : Dredging & reclamation & breakwater

  • Conducted Hydrographic and topographic surveys to support Dredging and reclamation and Rock work land development projects, resulting in successful completion within deadlines.
  • Prepared Hydrographic survey and GIS maps and written reports and notable geographical features and loaded data into Hypack and AutoCad for design use.
  • Supported urban planning initiatives by providing detailed demographic and geographic data for future development projects.
  • Collaborated with architects and engineers to refine project plans, ensuring all structures were designed with accurate land topography in mind.
  • Conducted risk assessments for potential construction sites, identifying and mitigating factors that could impact project viability.
  • Optimized resource allocation for survey projects, conducting thorough site assessments to determine necessary equipment and personnel.
  • Led training sessions for junior surveyors, enhancing team skills and improving overall project performance.
  • Improved land dispute resolution with detailed boundary surveys and clear, precise documentation.
  • Guided field crews on proper survey methods and techniques.

Project Chief Hydrographic & Topographic Surveyor

HUTA Group
06.2007 - 03.2008
  • Project location King Fahad Industrial port Saudi Arab
  • Project Description: Dredging Reclamation
  • Collaborated with engineers, architects, and construction professionals to ensure accurate information was incorporated into designs.
  • Adapted quickly to changing conditions on job sites, efficiently adjusting plans as needed while maintaining overall project goals.
  • Assisted in training new team members on surveying techniques, fostering a supportive work environment for continued growth.
  • Conducted Hydrographic topographic surveys to support land development projects, resulting in successful completion within deadlines.
  • Coordinated survey crew activities and oversaw field operations.
  • Developed strong relationships with clients through consistent communication and timely delivery of results.
  • Reported on lakes, ponds, rivers and streams to identify navigable channels and recommend construction of piers, bridges and other structures.
  • Optimized resource allocation, effectively managing surveying teams and delegating tasks based on individual strengths.
  • Prepared GIS maps and written reports clearly depicting boundaries, landmarks and notable geographical features and loaded data into Hypack and AutoCad for design use.
  • Supported urban planning initiatives by providing detailed demographic and geographic data for future development projects.

Chief Hydrographic & Topographic Surveyor

HUTA Group
01.2007 - 03.2008
  • Conducted Hydrographic and topographic surveys to support Dredging and reclamation work land development projects, resulting in successful completion within deadlines.
  • Conducted Multi beam and single beam Inhalation and calibration for hydrographic survey topographic surveys
  • Read and used Hydrographic survey data to complete analysis of Dredging work and reclamation
  • Coordinated survey crew activities and oversaw field operations.
  • Prepared Hydrographic Survey maps and written reports clearly depicting boundaries, landmarks and notable geographical features and loaded data into Hypack for design
  • Implemented new surveying technology to increase data collection efficiency, significantly reducing project turnaround times.
  • Reviewed and checked survey, subdivision and parcel maps to verify compliance with laws.
  • Applied training and mathematical abilities to calculate heights, depths and relative positions of terrain.

Project Hydrographic and Topographic Surveyor

HUTA Group
01.2005 - 01.2007
  • Project location Dammam seaport Saudi Arab
  • Project Description: Dredging Reclamation
  • Conducted multi beam and single beam installation and calibration on site and boat setup for hydrographic survey
  • Conducted Hydrographic & topographic surveys to support Dredging and reclamation land and Sea development projects, resulting in successful completion within deadlines.
  • Utilized GPS Multibeam technology for efficient data collection, expediting the completion of fieldwork assignments
  • Led training sessions for junior surveyors, enhancing team skills and improving overall project performance.
  • Improved project timelines with efficient management of survey teams and streamlined data collection processes.
  • Optimized resource allocation for survey projects, conducting thorough site assessments to determine necessary equipment and personnel.
  • Provided critical data for infrastructure projects, enabling accurate planning and execution by engineering teams.
  • Conducted risk assessments for potential construction sites, identifying and mitigating factors that could impact project viability.
  • Enhanced accuracy of land boundary definitions by conducting detailed topographical surveys and utilizing advanced GPS technology.
  • Streamlined communication with clients by preparing detailed survey reports and presentations, ensuring clarity and understanding of survey findings.
  • Coordinated surveys to establish accurate legal boundaries for properties.
  • Guided field crews on proper survey methods and techniques.
  • Reviewed and checked survey, subdivision and parcel maps to verify compliance with laws.
  • Implemented new surveying technology to increase data collection efficiency, significantly reducing project turnaround times.

.

Marine and Civil Superintend

Athena S a
07.2013 - 06.2014

Timeline

Marine and Civil Superintend

Athena S a
07.2013 - 06.2014

Survey Manager

Archirodon Construction
05.2012 - 05.2013

Survey Manager

Archirodon Construction
04.2011 - 04.2012

Project Chief Hydrographic Surveyor

Archirodon Construction
03.2010 - 04.2011

Project Chief Hydrographic &Topographic Surveyor

HUTA Group
03.2008 - 04.2010

Project Chief Hydrographic & Topographic Surveyor

HUTA Group
06.2007 - 03.2008

Chief Hydrographic & Topographic Surveyor

HUTA Group
01.2007 - 03.2008

Project Hydrographic and Topographic Surveyor

HUTA Group
01.2005 - 01.2007
Samseer Husain