Summary
Overview
Work History
Education
Skills
Timeline
Generic

SHERVIN M. DELEVEAUX

Freeport

Summary

Passionate and experienced construction professional with over 30 years in the industry. A licensed contractor with a proven track record of leading major construction projects across The Bahamas. Expertise includes concrete work, structural carpentry, marine construction, and heavy equipment supervision. Strong leadership and problem-solving skills with a commitment to safety and precision.

Overview

37
37
years of professional experience

Work History

Carpenter Foreman & Drill Barge Foreman

Orion Marine Construction Inc.
11.2023 - Current
  • Supervise formwork construction and ensure forms are built and set correctly
  • Verify rebar placement and ensure proper concrete coverage
  • Oversee concrete pouring, ensuring quality finish and adherence to grade
  • Direct barge operations into position
  • Dismantle and reassemble drill rig and kelly bar from crane
  • Ensure correct attachments are used for drilling and that pipe piles are cleaned
  • Monitor drilling depths and maintain accurate drill logs
  • Track crew time and enforce all safety regulations on site

Superintendent

GLF Marine Construction Company
03.2017 - 02.2018
  • Managed and organized construction workforce
  • Oversaw the building of side and bottom forms
  • Supervised concrete pouring and finishing operations

Foreman

American Bridge Construction Company Inc.
05.2015 - 03.2016
  • Coordinated crew assignments and work scheduling
  • Directed formwork construction and rebar placement
  • Managed concrete pouring and finishing tasks

Carpenter Foreman

The Freeport Container Port
09.2011 - 06.2012
  • Constructed formwork for various structural components
  • Tied steel and prepared site for concrete placement
  • Built curb aprons and placed boulders for port infrastructure

Carpenter Foreman

Arawak Cay Container Port Development Project
08.2009 - 12.2010
  • Supervised carpentry operations including formwork and steel tying
  • Collaborated with team on port development tasks to ensure timely and accurate construction

Foreman

Grand Bahama Shipyard Dry Dock
01.2000 - 12.2000
  • Framed hammerheads and poured decking for dry dock facilities

Docking Facilities, Marsh Harbour (Abaco)
01.2001 - 02.2003
  • Capped sheet pilings and installed bollards
  • Poured flooring for storage buildings

Foreman

Matt Lowe’s Cay Holdings Ltd.
03.2003 - 05.2006
  • Poured footings and sea walls
  • Capped sheet pilings for private island development

Foreman

Robert Claridge Construction Company
07.2006 - 12.2007
  • Renovated standard hardware store in Abaco

Carpenter Foreman

Misner Marine Construction Inc. New PI Bridge
02.1998 - 06.1999
  • Supervised a crew of 12 men
  • Prepared workmen for pouring of footings and columns
  • Set up forms for hammer heads and executed concrete pours
  • Installed screed rails for the Bidwell machine to pour the bridge's top surface

Carpenter Chargehand (Seaside Frontwall)

Freeport Container Port Project
09.1996 - 02.1998
  • Built forms and poured concrete for the hurricane tie down wall
  • Constructed forms for tie-back rods and anchor bolts
  • Assisted Mr Arnold Ridge in the precast yard and later took full operational responsibility for large modular form systems

Carpenter Chargehand

Freeport PowerPlant Misner Marine Construction Inc
09.1996 - 02.1998
  • Assisted with the building forms for a large generator bed
  • Tied rebars and built fire walls
  • Also constructed circular concrete walls for fuel and oil tanks

Carpenter

Centrex Rooney Construction Company
10.1994 - 10.1994
  • Contributed to underwater causeway construction for (Phase One), Sun Atlantis
  • Executed precise carpentry work in marine construction conditions

Carpenter

Balfour Beatty Construction Company
03.1988 - 11.1991
  • Participated in the full construction of the Crystal Palace Hotel
  • Built beach houses and villas on Great Harbour Cay
  • Worked on Phase One of the Clifton Pier Power Station for the Bahamas Electricity Corporation

Education

Graduate - Class of 1982

Government High School
01.1982

Skills

  • Teamwork
  • Leadership
  • Ability to work under pressure
  • Adaptability
  • Reliability
  • Responsibility
  • Strong work ethic
  • Problem-solving
  • Decision-making

Timeline

Carpenter Foreman & Drill Barge Foreman

Orion Marine Construction Inc.
11.2023 - Current

Superintendent

GLF Marine Construction Company
03.2017 - 02.2018

Foreman

American Bridge Construction Company Inc.
05.2015 - 03.2016

Carpenter Foreman

The Freeport Container Port
09.2011 - 06.2012

Carpenter Foreman

Arawak Cay Container Port Development Project
08.2009 - 12.2010

Foreman

Robert Claridge Construction Company
07.2006 - 12.2007

Foreman

Matt Lowe’s Cay Holdings Ltd.
03.2003 - 05.2006

Docking Facilities, Marsh Harbour (Abaco)
01.2001 - 02.2003

Foreman

Grand Bahama Shipyard Dry Dock
01.2000 - 12.2000

Carpenter Foreman

Misner Marine Construction Inc. New PI Bridge
02.1998 - 06.1999

Carpenter Chargehand

Freeport PowerPlant Misner Marine Construction Inc
09.1996 - 02.1998

Carpenter Chargehand (Seaside Frontwall)

Freeport Container Port Project
09.1996 - 02.1998

Carpenter

Centrex Rooney Construction Company
10.1994 - 10.1994

Carpenter

Balfour Beatty Construction Company
03.1988 - 11.1991

Graduate - Class of 1982

Government High School
SHERVIN M. DELEVEAUX